MADE IN CHINA

EXCAVATOR UNDERCARRIER PARTS

EXCAVATOR ENGIN PARTS

  • China EX200 link separate
  • China EX200 link separate
  • China EX200 link separate

EX200 Link Separate For HITACHI Excavator Undercarriage Link Parts

Brand :F-Times,AFA,UTD

Product origin :Quanzhou Fujian China

Delivery time :30days

Supply capacity :20000pcs

Because the center distance of the chain drive is designed to allow the use of even-numbered chain widths, the number of chain links is generally even. It is the even number of the chain that has the sprocket with odd teeth, so that they wear evenly to the greatest extent possible and extend their service life.

Product Information
 

China EX200 link separate



China EX200 link separate

Brand Name F-Times,AFA,UTD
Products TypeEX200 link separate
Place of ProductionQuanzhou Fujian China
Use
Excavator, Bulldozer, ect
Technology
Forging Casting/Smooth Finish
FeatureDurable, Strong
Material35Mn
Color Commonly use color, Customized
MOQ 10pcs
PackageCustomized
Shipment FOB

 

Product Information
 
  

China EX200 link separate

China EX200 link separate

   

      1. Our chains are professionally designed to make the chain pins and chain sleeves more robust. The links between the links are connected by a chain pin and a chain sleeve, and the links and the sleeve are covered with a thick abrasive to prolong service life in a highly abrasive environment.


  2. The unique heat treatment process gives the chain a high quality surface hardness and excellent hardening depth and is resistant to wear and toughness.


  3. In the production process, the chain pin and the chain sleeve are matched in size to improve the firmness of the joint and improve the wear resistance, strength and durability to extend the service life.

 

  4. Perfect sealing performance, suitable for medium and high impact conditions. Such as alpine rocky land, forests, undulating terrain, etc.


 

 China EX200 link separate

  

 

 

Product Process
 
 

               China EX200 link separate

China EX200 link separate Track roller

                             

China EX200 link separate

China EX200 link separate

After the chain works for a period of time, wear causes the pin to become thinner, and the sleeve and rollers to become thinner. Under the action of the tensile load F, the chain pitch is extended.


  After the chain pitch becomes longer, the pitch circle d moves toward the tooth top when  the chain is wound around the sprocket. Generally, the number of chain links is even to avoid the use of transition joints. In order to make the wear uniform and improve the service life, the number of teeth of the sprocket and the number of chain links should be mutually prime. If the quality is not guaranteed, the common factor should be made as small as possible.


  The larger the chain pitch, the higher the theoretical carrying capacity. However, the larger the pitch, the greater the dynamic load caused by the change in chain speed and the impact of the chain linking into the sprocket, which will reduce the chain's bearing capacity and life. Therefore, a small-pitch chain should be selected as much as possible in design. The actual effect of selecting a small-pitch multi-row chain under heavy loads is often better than selecting a large-pitch single-row chain.

China EX200 link separate

How to prevent slack in EX200 link separate


  Our EX200 link separate will become loose or even disconnected in the case of long-term use and excessive wear. To prevent EX200 link separate, first of all, in order to prevent the wear and disconnection of EX200 link separate, we should improve the tension of EX200 link separate. In order to reduce its wear and tightness, we can choose a better quality EX200 link separate, which can improve the machining accuracy of the gear and the hardness of the working surface.


  When we install EX200 link separate, we should install it in parallel with the EX200 link separate axis and properly calibrate it. This can effectively reduce the wear of the EX200 link separate. Otherwise, the deviation of the EX200 link separate and EX200 link separate axes will worsen the EX200. link separate wear and tear.

 

  We have improved the tightness of the EX200 link separate. You can change the gold screws from two to four, which will make the operation lighter and increase the safety of the EX200 link separate operation.

 

China EX200 link separate

 


China EX200 link separate


China EX200 link separate

Get the latest price? We'll respond as soon as possible(within 12 hours)
close left right