• China PC200 track link
  • China PC200 track link
  • China PC200 track link
  • China PC200 track link
  • China PC200 track link

Excavator Undercarriage Parts PC200 Track Link For KOMATSU

Brand :F-Times

Product origin :Quanzhou Fujian China

Delivery time :30 days

Supply capacity :20000 pcs

The PC200 track link forged with 35MnB special steel, and the technology of strengthening structure and advanced quenching heat treatment hardening process make the product excellent in toughness and wear resistance, continuous, no cracking, no bending.

Product Information
 

China PC200 track link

China PC200 track link

China PC200 track link


Brand Name F-Times,AFA,UTD
Products TypeTrack Link
Place of ProductionQuanzhou Fujian China
Use
Excavator, Bulldozer, ect
Technology
Forging Casting/Smooth Finish
FeatureDurable, Strong
Material35Mn
Color Commonly use color, Customized
MOQ 10pcs
PackageCustomized
Shipment FOB

 

Product Information
 
  

China PC200 track link

Maintenance of excavator track links


  1. Inspection: In the process of stopping the use of the excavator, we must carefully check the screws of each part to see if the track link of the excavator is loose, and the cables, speed reducers, track pads, wire rope, Whether the system and other components are abnormally worn or damaged.


  2. Cleaning: It should also ensure that the surface of the excavator is cleaned thoroughly to prevent dust and foreign objects on the excavator crawler link from entering the inside, affecting the normal operation of the excavator. And eliminate our production risks, so that our safety performance is further improved.


  3. Lubrication: Good lubrication can reduce mechanical failure and wear during operation. Lubrication must be performed strictly in accordance with the amount, duration and type of oil specified in the excavator's manual.


Deviation requirements for installation position of excavator chain link


  The end faces of two sprocket wheels in the same transmission assembly should be in the same plane. When the center distance of the sprocket wheels is less than 0.5 meters, the deviation can be 1 mm; when the center distance of the sprocket wheels is more than 0.5 meters, the deviation can be 2 mm. However, there must not be friction on the side of the sprocket teeth. If the two wheels are offset too much, it is easy to cause off-chain and accelerated wear. Care must be taken to check and adjust the offset when replacing the sprocket.


China PC200 track link   

 

 China PC200 track link

  

 

 

Product Process
 
 

China PC200 track link

               China PC200 track link

China PC200 track linkTrack roller

 

  Our main producing products of our company : Track Link, Track Roller, Front Idler, Carrier Roller, Sprocket, Track Shoes and so on.


  In the company, great attention is paid to basic management, stable quality, continuously improving, pre-sale services, sale and after-sale services.


  In this way, our products have continued to gain market acceptance and customer satisfaction over the past few years.

China PC200 track link

China PC200 track link

China PC200 track link

 

China PC200 track link

 


China PC200 track link


China PC200 track link

Get the latest price? We'll respond as soon as possible(within 12 hours)
close left right