MADE IN CHINA

EXCAVATOR UNDERCARRIER PARTS

EXCAVATOR ENGIN PARTS

  • China SK350 carrier roller

Excavator Undercarriage Parts SK350 Carrier Roller For KOBELCO

Brand :F-Times,AFA,UTD

Product origin :Quanzhou Fujian China

Delivery time :30days

Supply capacity :20000pcs

1. The design of the gap ensures lubrication of the worn surface.
2. Special steel shell not only prevents deformation but also perfectly combines with pressure.
3. A good heat treatment can ensure the depth of hardening and improve wear resistance, while a good support structure prevents deformation.
4. High surface hardness and standard process can guarantee the service life of iron/copper sleeve.

Product Information
 

China SK350 carrier roller

Brand Name F-Times,AFA,UTD
Products TypeSK350 Carrier roller
Place of ProductionQuanzhou Fujian China
Use
Excavator, Bulldozer, ect
Technology
Forging Casting/Smooth Finish
FeatureDurable, Strong
Material40Mn, 50Mn
Color Commonly use color, Customized
MOQ 10pcs
PackageCustomized
Shipment FOB

 

Product Information
 
  

  

Reasons for excavator off-chain


1. Off-chain caused by failure of the tensioning cylinder.

  

At this time, you should check whether the tensioning cylinder has forgotten to butter, and see if there is any oil leakage from the tensioning cylinder.



2. the off-chain caused by severe track wear.



If it is used for a long time, the track must be worn, and the wear of the links, chain barrels, and other components on the track can also cause the track to delink.


3. Dechaining due to wear of the chain protector.


Now almost all excavator tracks have chain protectors, and the chain protectors can play a very important role in preventing delinking, so it is also important to check whether the chain protectors are worn.


4. Disengagement caused by wear of drive motor ring gear.


For the drive motor ring gear, if the wear is severe, we need to replace it, which is also an important reason for the off-chain of the excavator.


5. Dechaining caused by the damage of the supporting sprocket.


Under normal circumstances, oil leakage from the sprocket oil seal will cause serious wear of the sprocket, which will cause the track to be off-chain.


6. Off-chain caused by damage of guide wheel.


When looking at the guide wheel, make sure that the screws on the guide wheel are not missing or broken. The slot of the card guide wheel is not deformed.


 

 China SK350 carrier roller

  

 

 

Product Process
 
 

               China SK350 carrier roller

China SK350 carrier roller

 

  Quanzhou Future Times Trading Co.,Ltd has always been committed to developing and manufacturing the undercarriage parts of excavator bulldozer construction machinery since its establishment in 2009.                       

China SK350 carrier roller

China SK350 carrier roller

China SK350 carrier roller

 

China SK350 carrier roller

 

Q1: How to ensure the goods is available for my machine?

A1: We have the service information system which can check the machine parts 

information precisely. You can measure the parameter and then we will find that.


Q2: How do you guarantee your good's quality?

A2: First, we have severe quality-control system and ISO certification. Second,

we will sign up the parts warranty policy with you.  And last, you can visit our

factory or ask some quality-test organization to check that.


Q3: What's your advantages which is different from others?

A3: The company advantages : we have a very complete service system. 

The product advantage:the company pays attention to the product quality, 

the use value which pays attention to the customer, provides the high quality 

product with the outstanding cost performance for the domestic and foreign customer.


Q4: What's your delivery time?

A4: It depends on your order quantity. If the products you need are in stock, 

we would arrange dispatch within 7 days after you pay. If not, the delivery time

can be negotiated.


 


China SK350 carrier roller


China SK350 carrier roller

Get the latest price? We'll respond as soon as possible(within 12 hours)
close left right